Russell-Person-Blounts Bridges and Stream Improvements

image (3).png

The Russell-Person-Blounts Bridges and Stream Improvement Project is estimated to cost $40 million and is one of the largest projects included in the City of Fayetteville’s Comprehensive Watershed Master Plan. The project will expand Blounts Creek’s capacity to carry stormwater and replace or lengthen four bridges to improve water flow during heavy rainfall. Once completed, the improvements are expected to reduce flood depths by up to five feet in areas south and east of downtown.


Project Improvements

Stream improvements will extend along Blounts Creek from South Cool Spring Street downstream through Campbell Avenue, Russell Street and Person Street.

The project includes improvements to four bridges:

  • Person Street Bridge
  • Russell Street eastbound bridge
  • Russell Street westbound bridge
  • Railroad bridge between the eastbound and westbound lanes of Russell Street

The expanded creek channel and longer bridges will allow more water to flow through the area, helping reduce flooding during heavy rain.


Project Background

The improvements were identified in the Blounts Creek Watershed Study, which is part of the City’s Comprehensive Watershed Master Plan. The study looked at flooding concerns throughout the watershed and identified bridge replacements and stream improvements as priorities.

The project also includes improvements related to the eastbound Russell Street bridge, which was severely damaged by a fire in December 2023. The fire was caused by a ruptured natural gas line beneath the bridge. NCDOT later demolished the structure for safety reasons, and the eastbound lanes of Russell Street have remained closed since the incident. The project is part of the City’s ongoing work to address flooding and improve stormwater infrastructure in Fayetteville.

Russell-Person-Blounts Bridges and Stream Improvements Additional Photos and Maps

image (4).png